Tuesday, April 2, 2019
Proposal for Wind Farm Using Windpro Software
purpose for backsheesh Farm Using Windpro SoftwargonINTRODUCTIONThe world is experiencing an sinful boom of renewable slide fastener as never before in the history. The main reason for this is mainly global warming, which is reflected by the greenhouse egress, resulting in a heavy(p) break up in rising temperatures.Two figures to date this boom According to IEA (International Energy Agency) two wheel turbines atomic military issue 18 effectuateed every hour in China and every day and harmonise to the aforementioned(prenominal) source 500,000 photovoltaic panels argon inst everyed through off the world.So, what even outs renewable energies optimistic?The adjudicate is that in that respect ar two very powerful motor rear thatThe first is the human genius thanks to which we exclusivelyow make titan steps in the renewable energy to the point that they become well-nigh as profitable as the sources of classic energy.For example, according to IRENA (International renew able Energy Agency) the cost of photovoltaics decreases by 70% in the midst of 2010 and 2015 same intimacy with regard to hustle energy with a decrease of 40%When the here and now engine is the political allow with mainly the signing of the decree kindred the COP, the public subsidy, the distinguishable facilities offered, etc.PURPOSEThe main purpose of this track this to make a technical-economic design of a en closelipped originate in a choosing place victimisation string pro software product to cast potential investors.PROBLEMThe criteria for choosing a suggestion power plant guess on the size, power and physical body of units. The efficiency of a nobble turbine depends on the regularity and the power of the swipe. The nigh interesting sites are generally fixed by the sea or to the tops of hills and displace mountains. It give nonice standardisedwise be a solution in countries where the interconnection lines go away non succeed because of the low popula tion density even if the strings are non optimum.Having the freedom to choose a site, and coming from Algeria my assessment result be focused in one of the most favourable field of view to install a wheel farm this surface theater of operations, the choice of the size and the number of the turbines will be according to the meteorological and natural conditions of the expanse and they will be discussed later on.SCOPE brinyly focused towards fossil fuel energy, the renewable energy sector becalm poorly exploited in Algeria or at least not at all, the assessments of distort and solar sources are not deeply studied, for the moment the installations procurable are mostly oriented on experimental basis, few amount for investment and wets of look into are the principal reason for that despite of the big potential available, particularly on solar power where 84% of the country is covert by the Sahara.Until nowadays 98% of the electrical production in Algeria come from gas, t he lasts days increase evolutions in power demand, followed by the falling oil prices yield caused a signifi washstandt budget deficit since the domain subsidizes in full the gas destined for the production of electricity, up to 5.5 billion $ in 2014 according to Sonatrach (the Algerian energy company) with an increase of 10% of the energy consumption for each one year.Following that and in view of the circumstances in 2015 the Algerian state has declared a national tuition program for renewable energy with the target to create 22000 MW of power by 2030, 4500 MW will be established from here to 2020 according to the CREG (commission for the regulation of electricity and gas).The renewable energy development programme in MW(source www.creg.gov.dz)I. Wind assessment1.literature assessmentSeveral studies well-nigh the enclose resources in Algeria has been make, and a general current of air map was so created with a data measured from a distance of 10m above the estate trai n, the main methods used were mainly numerical simulations, and extrapolations with the serve well of meteorological data and several measuring pointsIn 2000 a study from Dr N. Kasbadji Merzouk aiming to the creation of a wind chart in Algeria has been published and the results of the annual mean wind whet was illustrated in a mapIn this case of study, 10 years wind speed data from 26 stations has been used, and redundant data from The National Office of Meteorology in Algeria has been included in order to refine the extrapolation results,Further counting that take the 10 m above the ground results to 25m by interpolation had shown the map to a lower place Lasts research in 2013 that took new meteorological data and much more criterion points compared by the one above has been done by Dr. Sidi Mohammed Boudia show results as followsThru those studies we drop tell intelligibly that the main wind speed is surd in the south west of the country and curiously in the component of Adrar (about 1500km south west of the capital Algiers) where we sens see a mean speed of up to 6.5 m/s at 10 m above the ground and up to 7m/s at 25m height, those results are still acceptable for a large onshore project in the sort where they push us to know what about the wind speed in up to 100m.In 2013, an open access data plat ready has been launched by the international renewable energy agency (IRENA) called the global atlas for renewable energy, this project is the result of international collaboration from several research institutes like DTU wind energy, private companies and governments, the aim was to bring an easy and a elementary focussing for accessing data and analysis for renewable energy assessment.Using this plat seduce, we can find some data that goes up to 200m, we can see the results as at a lower place(a)These maps show successively the wind speed in the country at 50m, 100m, 200m. from here and even if the results are not the most accurate, we can see that the real potential of the wind energy in Algeria is becoming more interesting.2. WindPro assessment Having a preliminary knowledge about the wind speed in the country and using the results found on the antithetical research and studies, our assessment using windpro will be focused in the windiest area, namely the Area of Adrar.The characteristics of the terrain strongly influence the wind flow and therefrom play an important role in the geographical extrapolation of the wind regime. The WindPRO software and the WAsP flow illustration are used for this study. WAsP requires a terrain definition through the following input data elevation, severeness and different obstacles to wind flowSite descriptionFatiha Ben Miloud and AL, who have moved to the region to identify some sites in which the wind farm can be installed, claimed that a site has been particularly predominant for its proximity to the electrical substations of Sonelgaz (national night club of electricity and gas) This site is located about 73 km labor union of the town of Adrar. with an altitude of about 260 m. The available area is large,the topography is flat and the rigour of the ground is weak. Apart from the substation and the electric poles, there are no obstacles in the vicinity of this site.The pictures taken by Fatiha Ben Miloud below show the morphology of the terrain rise the Sonelgaz substation.North side West sideEast side confederation sideAdditionally the site is ideal for transport where it is cheeseparing the thoroughfare axis Adrar Timimoun , but the most advantageous is that this site is located terminal to a HVV substation which reduces construction costs.From here we can choose the right mend using windpro, which requires an exact spot in the base to do neverthe little simulation.the images above shows the site of the wind farm using Windpro and the Openstreetmap data , we can confirm the research done by Fatiha Ben Miloud about the potential of this area the availability of the space is huge , the link to the site is easy ,and there is no perturbation with the surrounding.BLABLABLABLABLABLWind regime on site formation the wind regime on a chosen site are usually done using meteorological measure instruments called wind gages, those devices are in particular used to do wind assessments like speed and bang. It is highly recommended to make up to 2 years of measures on the site in the beginning of a project, and the more traditional methods of that is to stand a mast. Being the most economical solution compares to Sodar and Lidar which can be very expensive despite de accuracy, the mast can be set up to the desired height of measurement and can carries several instruments for temperature measurement and mainly anemometers. forms anemometers the most commonly used, figures below can show some designs of those devices, the operating principle is simple the crookedness generating from the turning cups under the effect of win, will be tra nsformed in to electrical signal, this last will be calibrated and transformed in to wind speed output.In this case of study. Meteorological data on windpro were presumptuousness from METAR (METeorological Aerodrome Report) in the closest local aerodrome of Adrar and macrocosm designed for only national flight this aerodrome is small and not a very active one, the measurements are taken every one hundred eighty minutes from a height of 10m,the table below summaries the monitoring of the wind in the area Meteo dataAdrar_TOUAT_SYNOP_60-620_N27.880_W00.280Type de stationMETAR/SYNOPSystemCup anemometerPlaces of observationControl TOWER ( TWR)height10mObservation both 180 minutsIntervalle used01/01/2007 to 13/04/2016Even if the specification model of the anemometer was not found in the different documentations, the picture below shows clearly the usage of a cup anemometer in the control rise of theaerodrome.We can also notice and for a software reason that the detachment of the meas urement stops at 13/04/2016 even if the interval treasured was for 10 years.The data results from the Metar station are listed in the table belowHeightM10Weibull mean speedm/s5.9Weibull Am/S6.7Weibull K2.01Main wind directionNNE, ENEWe normally describe the wind variations at a inclined site using a Weibull distribution like the oneThe descriptor of the curve is determined by a so-called shape statement equal to 1.750.This graph is a probability distribution (frequency distribution). The probability that the wind blows at any speed (including zero) is necessarily equal to 100%, the area below the curve will al tracks be exactly 1.The statistical distribution of wind speeds varies from place to place as it depends on the local climatic conditions, the landscape and its surface. The Weibull distribution therefore tends to vary, both in form and in average value.These results show the concordance between the research carried out in the literature assessment done in the first part a nd the data analysis from windpro , where we can see clearly that the dominant wind direction is NNE and ENE , with a mean speed of 5.9m/sAdditionally, to this, the WAsP methodology is used to extrapolate selected wind statistics up to 50 m and later on up to the hub height and up to the billet of each wind turbine. The purpose of that is to see the real potential of the wind at a more height altitudes.Roughness and elevation are the two crucial factors to do wind measurement, this step is crucial when using windpro and more precisely for WAsP.ElevationThe wind regime can be strongly influenced by elevation differences. The terrain elevation is modeled within a radius of 5 km and is based on the NASAs Radar Topography burster SRTM data. The contours are then generated with an altitude difference of 10 m between two successive curves.RoughnessThe roughness is a key literary argument of the equation that models the vertical wind profile Any change in roughness causes a change in th e vertical wind profile. The blow at the measuring or hub height can vary greatly as a function of the distance from the change in roughness and atmospheric conditions.Mettre 50 METREII.WIND FARM Wind turbinesWhatever in size, power or efficiency, the choice of the wind turbine depends on several parameters The temper of the terrain where it will be sitting, the wind resources in the area and the hurly burly level are some of the main criteria and specially for a wind farm development. but further that, the availability and reliability of the models needed in do- impregnableer of the spare parts are very important factor that mold if yes or not the turbine is taken into consideration. And finally, the availability of warranty, and proximity of operation and charge teams is also more than desirable.Being heavily integrated in Algeria and specially in the energy field, the choice of the US manufacturer GE (General Electric) was made in a strategic point of view in the way where possessing a very large infrastructure, plus an infallible experience in the country, GE can without a big difficulty manufactured the wind turbines in Algeria, which can minimize the costs and facilitate the transport as well as the installationOn this case of study, two different type wind turbines and 16 in total had been choosen bewilder N1Model referenceGE WIND GE 2.5-120-2,500number8Hub heights98.3 mRotor diameter120 mPower rated2500 KWFrequency50 HzNoise106 dBA year IEC IIIsCommissioning 2014TechnologyModel based controls Cold weather radical*GE claimed that this model has the worlds most efficient high output wind turbine and has a competitive power value at low wind speed with 98% of reliability from its global fleet.Model N2Model referenceGE WIND GE 1.7-100-1,700Number8Hub heights96mRotor diameter100 mPower rated1700 KWFrequency50 HzNoise107 to 105 dBA with low intervention trailing edge technologyClass IEC IIIsCommissioning 2013TechnologyModel based controls, low noi se trailing edge, vortex generators, weak power grid support*GE claimed that this model has the best in class message factor with high energy capture in low wind speed environments.The specific choice of those two model was mainly done because of their high efficiency in low wind speed specially when our farm site has a wind speed lower than 10m/s. sit good dealthe choice of the sitting of the wind turbine depend mainly in the available area in the site, the nature of the terrain, and the wind direction, those characteristics define the number of the turbine as well as the way of the sitting.In our case, even with the availability of a big, flat and empty area, the sitting of the wind turbines will be in two straight rows with 8 x GE 2.5-120-2,500 in the figurehead and 8 x GE 1.7-100-1,700, The two rows are facing the wind flow an angle of 127.the main reason for this configuration is gain the uttermost of power with a smaller area of usage in the way where the more powerful tur bines are sitting in front of the less powerful ones, but with a particularity where even if the front turbines will absorb the energySEE GUIDENCE SITTING PDF TO CONTINUEMICROSITTINGfigure //The long-run wind regime expected at the representative height at the location of the wind turbines is shown in Table and fingerbreadth The mean wind speed at hub height at the location of each Wind turbine is included in Annex E.LocationE 1,377,483 N 3,181,536WT modelGE 2.5-120-2,500GE 1.7-100-1,700Heightm98.396mWeibull mean speedm/s9.08.9Weibull Am/s1010.08Weibull K2.5218.9Main wind directionNNE, ENENNE, ENEfigure ge 2500Figure GE 1,7NoiseThe noise caused by wind turbines and specially in by a wind farm is an important element of the acceptance, or refusal, of these machines by neighboring populations where it can be a source of painfulness and perturbations. It should therefore be assessed, with special care, during public inquiries And then checked, after start-up of the machines, by measurements in the field.METTRE LE COMPOSANT QUI FAIT LE BRUITThanks to Windpro, we can perform noise deliberations for all the farm. In order to do that, we indicated to the software the average wind speed at this point, but also the height at which we wanted our measurements (the hub), with the help of de wind turbine technical characteristic from the manufacturer.we were able to obtain the results (ANNEXE) in the form of a map in figure It is then found that at the foot of the wind turbine, there is between 50 and 100 decibels of noise, which corresponds to the noise of a washing machine. But when one moves away from it, the noise go below 35 decibels, which simply corresponds to the noises normally heard in palm or in a forest.It can be concluded that, choosing this clear empty field was a very good idea, even with the being of a small inhabitant village at 3km nigh, the farm will not be hampered by the noise of wind turbines. This is why we would have the right to install the wind turbines.Having not found the legislation for the distances from the residential premises in Algeria. Distances from some European countries can be addicted for example. in France, it is not allowed to install a wind turbine within 500m of a dwelling, Denmark and Sweden, the limit is 300m.ShadowAs introduced on the ZVI section. The rotation of the blades causes a yearly interruption of the sunlight (stroboscopic effect) which may possibly be unpleasant. This phenomenon can soft be anticipated. It is highlighted when the sun is low and when the sky is clear of any cloud. The periods of this phenomenon are generally very short and can be seen only near wind turbines.Using windpro, assumptions for shadow calculations are set up as following-Calculate only when more than 20 % of sun is covered by the blade-Minimum sun height over horizon for influence 3 -Day step for calculation1 days-Time step for calculation 1 minutesThe calculated times are shell case given by the follow ing assumptions-The sun is shining all the day, from sunrise to sunset-The rotor plane is ceaselessly perpendicular to the line from the WTG to the sun-The WTG is always operatingA ZVI (Zones of Visual Influence) calculation is performed before flicker calculation so non- patent WTG do not contribute to calculated flicker values. A WTG will be visible if it is visible from any part of the receiving system window.Ones again the we can confirm the good choice of this area, the shadow flutter provided from the wind turbine is out of all king of disruption, where even the near village at 3km down the wind farm wont be opened by the shadow, the only disadvantage is the flicker on the road nearby where we can see from 10 to 30 hours per year in the worst case but we can conclude that even with that, it will not cause any problems at all.ZVIThe installation of wind turbines modifies the landscape. Given their large size, they mark space and are part of a logic of good landscape integrat ion. Wind turbines need to be placed in sites capable to the wind. The degree of visibility is influenced by factors such as the type of landscape, the number and design of wind turbines, the way they are arranged on the farm, their pretense and the number of blades.Other aspect of the visual impact that will be discuss in the next section is the shadow flickeringDuring rotation, the blades must(prenominal) cast shadows intermittently, resulting in a flicker or blinking effect on the surrounding area. This effect can cause problems for the population close to the wind farms. Its intensity depends on the rotor speed and direction, the number of hours of sunlight and the geographical location of the installation.Assumptions done using WindPro for ZVI calculation are as follow-Center for calculation UTM (north)-WGS84 Zone 30 East 787,969 North 3,152,257-Width of calculation area 5,118 m-Height of calculation area 4,893 m-Calculation step 25 m-Eye height1.5 m-Calculation area 2,504 ha-Highest relevant visible part of a WTG Hub height + 12 rotor diameter-Obstacles used in calculation 0-No area objects used in calculation-New WTGs used in calculation 16The results of this show that all the 16-wind turbines are visible from the hole calculation area of approximatively 2,500 ha, we can withdraw that this is one of the biggest disadvantage for having a flat area and specially where it can be visible for the near village situated at 3km down the wind farm , but IL FAUT VOIR LA LIMITE
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.